Maintain an AI skill for exhibit object return checklist

Update the instructions, examples, and review checks when exhibit object return checklist changes.

Find the change that matters

Compare the latest signed loan notes and an object packing list with a known-good example. Write down which input changes and which part of a return packet for staff review it affects. Edit the corresponding rule or example and increment a visible version marker so later reviewers can tell which instructions generated a draft. Record the reason in the maintenance notes.

Example for exhibit object return checklist
Change entry: input changed, rule edited, fixture added, registrar review, revised output version.

Preserve a case that still matters

Keep a stable sample showing where one container holds two objects from different loans. Re-run it after the edit and verify that object number, loan identifier, container identifier, and recorded exception still reaches the correct part of the output. Add a separate fixture for the new rule if the old case should still work unchanged. Label each fixture with the version it is meant to represent.

Verify the edited handoff

Ask the registrar to reconcile the return packet against the object-to-loan mapping before any handover. Save a comparison of what changed in the new output and what still passes. If guidance is removed, check linked examples and asset names for references that would now be stale. Keep the previous skill revision until the team has enough evidence that routine work and important exceptions still behave as expected.

Worked case

Crate 12 contains objects from loans L-18 and L-22. Two object lines may share a container number, while each must retain its own original loan association.

Sources