Engineering
Present partial skill results with their scope intact
Show what was processed, what remains, and which conclusions the completed subset supports.
Partial work can save a user time when it is clearly described. An incomplete result becomes misleading when a heading or summary implies all inputs were processed. Make the completed scope part of the artifact rather than relying on a short explanation in chat.
Describe the denominator
State how many inputs were expected and which ones were actually evaluated or converted. Distinguish omitted, unavailable, invalid, and still pending items. If the request asks for a collection-wide rate, avoid extrapolating from the processed portion unless the method and assumptions support it.
Expose useful outputs separately
Keep valid artifacts available when safe, with a visible partial state. Name the source versions used. Preserve structured status fields for each missing item so a downstream consumer can retry eligible work without repeating completed operations.
Test the presentation flow
Open the artifact directly and check whether the reader can see its scope without the original chat. Exercise an empty partial result and one with a missing high-priority item. The same visible heading should not imply equivalent confidence in both situations.