Team workflows / Output formats
Specify an output contract for shared office equipment move brief
Make a proposed move sheet for review readable by a person and easy for later steps to validate.
Specify the unit of work
The output is a proposed move sheet for review. Define what counts as a record and which source identifier or locator identifies it. Keep extracted values, human decisions, and proposed changes in separate fields. Where an item can enter more than one draft, include the relevant scope or version so it has a stable identity within the handoff.
Suggested record fields: source locator, original value, proposed value, review status, question for the facilities coordinator.Make absence explicit
Create fields for asset label, current room, destination room, and approval status. Use an explicit status for missing, conflicting, or unreadable evidence. Give the reviewer the source locator and a brief explanation when a field needs attention. A schema can enforce the presence and type of a field in a compatible host, while verifying the value against its source remains a separate task.
Test a record that looks valid
Include an output that parses successfully even though an identical monitor is present in the destination and has a different asset label. Ask the facilities coordinator to verify both asset tags before the move is assigned to staff. Adjust the data contract if the reviewer has to infer which input was used or which part remains unresolved. Keep a human-readable example beside the machine-readable format to show exactly how a deferred item should appear.
Worked case
Two monitors are the same model and have different asset tags. The draft move sheet should keep the installed monitor in its room and list the requested asset by its own tag.